Monday, July 29, 2019

Project Management Academic Project Report Essay

Project Management Academic Project Report - Essay Example Enthusiasm about chances for success of this project is disagreed upon weakly (3). Support from top management another strong critical factor scoring an average percentile of 64.5 percent. Both the EMEA general manager and EMEA project manager indicated a 66 percent score, the head office engineers recorded an 83 percent score and EMEA engineers came in with the lowest score of 43 percent. It is moderately disagreed (2) that the management will support project personnel in a crisis (Pinto 1990, 173). The third strong factor in EMEA project is the technical tasks that, on average, had a percentile score of 82.25%. EMEA project manager had the highest individual percentile score in regards to technical tasks, 94% while head office engineers scored 89% on their ranking for technical tasks. The EMEA general manager was third, scoring a 77%, while EMEA engineers were last with a 69% score. There was, however, no disagreement on technical support. The average percentile score of 60.5% qualifies client acceptance as the other strong critical factor in the set of ten. EMEA project manager had the highest percentile score of 97% with respect to client acceptance and the head office engineers followed with a 63% score. EMEA engineers scored 51% on client acceptance while EMEA general manager scored the least with a 31%. It is weakly disagreed (3) that there is adequate presentation of the project has been developed for clients (Pinto 1990, 173). The average percentile score for monitoring and feedback as the other strong critical factor is 63.5%. EMEA project manager had the highest individual percentile score in monitoring and feedback, scoring 89%. EMEA general manager was second with an individual percentile score of 77% and EMEA engineers who scored 51% followed. The lowest scorer in monitoring and feedback were the head office engineers with a 37%. It is moderately disagreed (2) that the actual progress is regularly compared with the project

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.